Back to references

    Case study · Stadiums & Live Events

    Baku Olympic Stadium

    Delivering world-class audio and broadcast infrastructure for one of the largest sporting venues in the region.

    Baku Olympic Stadium — 68,000-seat capacity venue with world-class AV infrastructure.
    Baku Olympic Stadium — 68,000-seat capacity venue with world-class AV infrastructure.
    Venue
    Baku Olympic Stadium
    Location
    Baku, Azerbaijan
    Year
    2015
    Sector
    Stadiums & Live Events
    Services
    Audio Reinforcement · Broadcast Systems · System Integration · Field of Play Audio

    Major sporting events demand flawless audio coverage, robust broadcast infrastructure, and seamless system integration across vast, complex venues.

    Built to host the opening and closing ceremonies of the European Games, Baku Olympic Stadium required a state-of-the-art audiovisual infrastructure capable of supporting live broadcasts, stadium-wide announcements, and world-class event production. Asimetrik was responsible for the design, integration, and commissioning of the venue's core audio and broadcast systems.

    Stadium-scale audio design

    The project required a carefully engineered audio system capable of delivering intelligible, high-impact sound to every seat in the 68,000-capacity stadium. Asimetrik designed a distributed reinforcement architecture using premium loudspeaker technologies, ensuring consistent coverage, clarity, and impact across the entire bowl, VIP lounges, and concourse areas.

    Baku Olympic Stadium illuminated in red at dusk

    Broadcast-ready infrastructure

    Beyond audience reinforcement, the venue needed broadcast-grade audio infrastructure capable of interfacing with international television networks and live production teams. Asimetrik integrated comprehensive broadcast routing, commentary systems, and field-of-play audio solutions to meet the stringent demands of global sporting broadcasts.

    Interior view of the Baku Olympic Stadium bowl and field of play
    The Baku Olympic Stadium project demonstrates Asimetrik's ability to design and deliver complex audio and broadcast systems for high-profile international events at stadium scale.
    Baku Olympic Stadium glowing under an overcast sky

    Integration at scale

    A venue of this magnitude requires the seamless coordination of multiple audio, communication, and control subsystems. Asimetrik delivered an integrated ecosystem where public address, event audio, broadcast feeds, and backstage communication operate as a unified, centrally managed platform.

    Built for major events

    The stadium has since hosted international football matches, athletic competitions, and major cultural events, consistently delivering the audio performance required for world-class productions. The infrastructure remains a benchmark for large-scale sporting venue sound systems in the region.

    Planning a stadium or large-scale live event project?

    Our team designs audio, broadcast, and communication systems for stadiums, arenas, and live event venues where performance and reliability are critical.

    Start a conversation